[meteorite-list] OT- TEPCO Press Release

From: Count Deiro <countdeiro_at_meteoritecentral.com>
Date: Wed, 16 Mar 2011 13:15:49 -0700 (GMT-07:00)
Message-ID: <10442185.1300306549339.JavaMail.root_at_mswamui-swiss.atl.sa.earthlink.net>

Excellent post. It's about time the qualified professionals at TEPCO released a verifiable synopsis of what actually happened at the Fukushima installation. They included a quantitive report for their complete system. Those buttheads in the media and the anti-nukers will still demagogue this incident for their own self interest. But, the fact remains....the operators and the plants performed magnificently under the most severe physical circumstances that could be imagined. Now, maybe the press will turn its attention to the horrendous loss of life and property caused by the real dangers....earthquake and tsunami.

Count Deiro
IMCA 3536


-----Original Message-----
>From: Barrett <BarrettWF at comcast.net>
>Sent: Mar 16, 2011 8:27 AM
>To: meteorite-list at meteoritecentral.com
>Subject: [meteorite-list] OT- TEPCO Press Release
>
>
>Press Release (Mar 16,2011)
>Impact to TEPCO's Facilities due to Tohoku-Taiheiyou-Oki Earthquake (as of
>2:00PM)
>
>
>Below is the status of TEPCO's major facilities that suffered from the
>Tohoku-Taiheiyou-Oki Earthquake that occurred at 2:46PM, March 11th 2011.
>*new items are underlined
>
>[Nuclear Power Station]
>Fukushima Daiichi Nuclear Power Station:
> Units 1 to 3: shutdown due to earthquake
> Units 4 to 6: outage due to regular inspection at the occurrence of
> earthquake
>
>*The national government has instructed to evacuate for those local
> residents within 20km radius of the site periphery and to remain
> indoors for those local residents within 30km radius of the site
> periphery.
>
>*Since the value of radioactive materials (iodine, etc) at the site
> (outside) measured by monitoring car exceeded the ordinary level,
> it was determined that a specific incident stipulated in article 15,
> clause 1 occurred (Extraordinary increase of radiation dose at site
> boundary).
> - 4:17 pm, March 15th at the main gate of the site
> - 11:05 pm, March 15th at the main gate of the site
>
>* Unit 1
> The explosive sound and white smoke was confirmed near Unit 1 after
> the big quake occurred at 3:36pm, March 12th. We have started sea
> water injection at 8:20 pm and then boric acid into the reactor.
>
>*Unit 2
> At 1:25 pm, March 14th, since the Reactor Core Isolation Cooling System
> has failed, it was determined that a specific incident stipulated in
> article 15, clause 1 occurred (failure of reactor cooling function).
> At 5:17 pm, while the water level in the reactor reached the top of the
> fuel rod, we have restarted the water injection with the valve operation.
> At approximately 6:14 am, March 15th, the extraordinary sound was
> confirmed near the suppression chamber and the pressure inside the
> chamber decreased afterwards. It was determined that there is a
> possibility that something extraordinary happened in the suppression
> chamber. While sea water injection to the reactor continued, TEPCO
> employees and workers from other companies not in charge of injection
> work started tentative evacuation to a safe location.
> Sea water injection to the reactor is still under operation.
>
>*Unit 3
> At 6:50 am, March 14th, while water injection to the reactor was under
> operation, the pressure in the reactor containment vessel increased to
> 530 kPa. As a result, at 7:44 am, it was determined that a specific
> incident stipulated in article 15, clause 1 occurred (abnormal increase
> of the pressure of reactor containment vessel). Afterwards, the pressure
> has gradually decreased (as of 9:05 am, 450 kPa).
>
> At approximately 11:01 am, March 14th, an explosion followed by white
> smoke occurred near Unit 3. 4 TEPCO employees and 3 workers from other
> companies (all of them are conscious) have sustained injuries and they
> were already dispatched to the hospital by ambulances.
>
>*Unit 4
> At approximately 6:00 am, March 15th, an explosive sound occurred and
> the damage in the 5th floor roof of Unit 4 reactor building was
> confirmed. At 9:38 am, the fire near the north-west part of 4th floor
> of Unit 4 reactor building was confirmed. At approximately 11:00 am,
> TEPCO employee confirmed that the fire was off.
>
> At approximately 5:45 am, a TEPCO employee discovered a fire at the
> northwest corner of the Nuclear Reactor Building. TEPCO immediately
> reported this incident to the fire department and the local government
> and prepared to extinguish the fire. However, during an inspection at
> approximately 6:15 am, TEPCO staff found no signs of fire.
>
>Fukushima Daini Nuclear Power Station:
> Units 1 to 4: shutdown due to earthquake
>*The national government has instructed evacuation for those local
> residents within 10km radius of the periphery.
>
>*As the radiation dose at the site boundary exceeded the limitation,
> it was determined that a specific incident stipulated in article 15,
> clause 1 occurred (Extraordinary increase of radiation dose at site
> boundary) at 9:58 pm, March 14th and at 0:00 am, March 15th.
>
>*Reactor cooling function was restored and cooling of rectors was
> conducted. As a result, all reactors achieved cold shutdown: Unit 1
> at 5:00 pm, March 14th, Unit 2 at 6:00 pm, March 14th, Unit 3 at
> 0:15 pm, March 12th, Unit 4 at 7:15 am, March 15th.
>
>* (Unit 1)
> As it is confirmed that the temperature of the Emergency Equipment
> Cooling Water System *1 has increased, at 3:20 pm, March 15th, we
> stopped the Residual Heat Removal System (B) for the inspection.
> Subsequently, failure was detected in the power supply facility
> associated with the pumps of the Emergency Equipment Cooling Water
> System. At 4:25 pm, March 15th, after replacing the power facility,
> the pumps and the Residual Heat Removal System (B) have been
> reactivated.
>
>* (Unit 4)
> As it is confirmed that the pressure at the outlet of the pumps of
> the Emergency Equipment Cooling Water System*1 has been decreased,
> at 8:05 pm, March 15th, we stopped the Residual Heat Removal System
> (B) for the inspection. Subsequently, failure was detected in the
> power supply facility associated with the pumps of the Emergency
> Equipment Cooling Water System. At 9:25 pm, March 15th, after
> replacing the relevant facility, the pumps and the Residual Heat
> Removal System (B) have been reactivated.
>
>*1:emergency water system in which cooling water (pure water) circulates
> which exchanged the heat with sea water in order to cool down bearing
> pumps and/or heat exchangers etc.
>
>Kashiwazaki Kariwa Nuclear Power Station:
> Units 1, 5, 6, 7: normal operation
> Units 2 to 4: outage due to regular inspection
>
>[Thermal Power Station]
>Hirono Thermal Power Station Units 2 and 4: shutdown due to earthquake
>Hitachinaka Thermal Power Station Unit 1: shutdown due to earthquake
>Kashima Thermal Power Station Units 2, 3, 5, 6: shutdown due to earthquake
>Ohi Thermal Power Station Unit 2: shutdown due to earthquake
>Higashi-Ohgishima Thermal Power Station Unit 1: shutdown due to earthquake
>
>[Hydro Power Station]
>* All the stations have been restored.
>
>[Transmission System, etc.]
>All substation failed due to the earthquake have been restored.
>
>[Blackout in TEPCO's Service Area]
>Total of about 5,100 households are out of power.
> Tokyo: 0
> Kanagawa Pref.: 0
> Tochigi Pref.: 0
> Chiba Pref.: 0
> Saitama Pref: 0
> Gunma Pref.: 0
> Ibaraki Pref:5,100
> Yamanashi Pref: 0
> Shizuoka Pref: 0 (east of Fuji River)
>
>[Supply and Demand Status within TEPCO's Service Area to Secure Stable
> Power Supply]
>Backup supply from Shinshinano Conversion Station: 600MW
>Backup supply from Sakuma Conversion Station: 300MW
>Backup supply from Higashi Shimizu Conversion Station: 100MW
>Backup supply from Kitahon Interconnection Facility: 600MW
>
>Considering the critical balance of our power supply capacity and
>expected power demand forward, in order to avoid unexpected blackout,
>TEPCO has implemented rolling blackout (planned blackout alternates
>from one area to another) since yesterday. We will make our utmost to
>secure the stable power supply as early as possible.
>For customers who will be subject to rolling blackout, please be
>prepared for the announced blackout periods. Also for customers who
>are not subject to blackouts, TEPCO appreciates your continuous
>cooperation in reducing electricity usage by avoiding using unnecessary
>lighting and electrical equipment.
>
>[Others]
>Please do NOT touch cut-off electric wires.
>In order to prevent fire, please make sure to switch off the electric
>appliances such as hair drier and to shut down the breaker of distribution
>board when you leave your house.
>For the customer who has in-house power generation, please secure fuel for
>generator.
>
>
>______________________________________________
>Visit the Archives at http://www.meteoritecentral.com/mailing-list-archives.html
>Meteorite-list mailing list
>Meteorite-list at meteoritecentral.com
>http://six.pairlist.net/mailman/listinfo/meteorite-list
Received on Wed 16 Mar 2011 04:15:49 PM PDT


Help support this free mailing list:



StumbleUpon
del.icio.us
reddit
Yahoo MyWeb