[meteorite-list] GRAIL Launch Postponed to September 10
From: Ron Baalke <baalke_at_meteoritecentral.com>
Date: Fri, 9 Sep 2011 05:24:53 -0700 (PDT) Message-ID: <201109091224.p89COrS1020726_at_zagami.jpl.nasa.gov> http://www.jpl.nasa.gov/news/news.cfm?release=2011-283 Launch Postponed Until Saturday Jet Propulsion Laboratory September 08, 2011 GRAIL Mission Status Report CAPE CANAVERAL AIR FORCE STATION, Fla. -- The launch of a Delta II rocket carrying NASA's Gravity Recovery and Interior Laboratory (GRAIL) has been postponed one day to allow additional time to review propulsion system data from Thursday's detanking operation after the launch attempt was scrubbed due to upper level winds. The postponement will allow the launch team additional time to review the data. The launch now is planned for Saturday, Sept. 10, from Space Launch Complex-17B at Cape Canaveral Air Force Station, Fla. There are two instantaneous launch opportunities at 8:29:45 a.m. and 9:08:52 a.m. EDT (5:29:45 a.m. and 6:08:52 a.m. PDT). The forecast for Sept. 10 shows a 60 percent chance of favorable weather conditions for a Saturday morning launch. More information about GRAIL is online at: http://www.nasa.gov/grail and http://grail.nasa.gov . DC Agle 818-393-9011 Jet Propulsion Laboratory, Pasadena, Calif. agle at jpl.nasa.gov Dwayne Brown 202-358-1726 NASA Headquarters, Washington Dwayne.c.brown at nasa.gov George Diller 321-867-2468 Kennedy Space Center, Fla. george.h.diller at nasa.gov 2011-283 Received on Fri 09 Sep 2011 08:24:53 AM PDT |
StumbleUpon del.icio.us Yahoo MyWeb |