[meteorite-list] Dawn Update - September 7, 2007

From: Ron Baalke <baalke_at_meteoritecentral.com>
Date: Fri, 7 Sep 2007 09:57:59 -0700 (PDT)
Message-ID: <200709071657.JAA04559_at_zagami.jpl.nasa.gov>

09.07.07

George H. Diller
Kennedy Space Center, Fla.
321-867-2468
George.H.Diller at nasa.gov

STATUS REPORT: ELV-090707

EXPENDABLE LAUNCH VEHICLE STATUS REPORT

Mission: Dawn
Location: Astrotech payload processing facility
Launch Vehicle: Delta II 7925-H
Launch Pad: 17-B
Launch Date: Sept. 26, 2007
Launch Window: 7:25 - 7:54 a.m. EDT

Engineers loaded liquid oxygen aboard the first stage late last week
as a test for first stage components.

Dawn spacecraft operational readiness testing is complete.

Spacecraft thermal blanket closeout work is being finished today.

Technicians will be installing Dawn into the payload canister on Sept.
10 for transportation to Launch Complex 17. The spacecraft will be
mated to the Delta II rocket at Pad 17-B on Sept. 11.

The flight program verification, an integrated launch readiness test
with the Dawn spacecraft integrated with the Delta II, is scheduled
for Sept. 13.

Installation of the payload fairing around the spacecraft is scheduled
for Sept. 19.

Previous status reports are available on the Web at:

http://www.nasa.gov/centers/kennedy/launchingrockets/status/2007

        
-end-
Received on Fri 07 Sep 2007 12:57:59 PM PDT


Help support this free mailing list:



StumbleUpon
del.icio.us
reddit
Yahoo MyWeb