[meteorite-list] Dawn Journal - July 15, 2007

From: Ron Baalke <baalke_at_meteoritecentral.com>
Date: Tue, 17 Jul 2007 09:14:19 -0700 (PDT)
Message-ID: <200707171614.JAA21431_at_zagami.jpl.nasa.gov>

http://dawn.jpl.nasa.gov/mission/journal_7_15_07.asp

Dawn Journal
Dr. Marc Rayman
July 15, 2007

Dear Dawntothegrounds,

There are two ways for a spacecraft to leave its launch pad: climbing on
a blazing tower of powerful flames accompanied by a thunderous
announcement of its departure or suspended securely and gently on the
crane that hoisted it there in the first place. Now Dawn has the
opportunity to experience both, with the former to be in September and
the latter this month. The spacecraft and third stage of the Delta
rocket are being prepared now for removal from the second stage. They
will be transported to the clean room at nearby Astrotech Space
Operations before being returned to the launch pad in less than two months.

For more than a year, Dawn had been planning for a launch between June
20 and July 10. As is well known to readers of these logs in galaxies of
all shapes, Dawn's ion propulsion system affords it a flexibility in its
trajectory unavailable to missions that use conventional propulsion. One
of the important consequences of this is that, as we will see in more
detail in the next log, the postponement of the launch to September does
not change the scientific objectives or plans; even the dates for
arriving at Vesta and Ceres are essentially unaffected. Dawn's launch
period was chosen based on the readiness of the project to begin the
mission and on the schedule for the use of Cape Canaveral's Space Launch
Complex 17, from which Delta II rockets get their start to space.

In addition to Dawn lighting up the Florida skies, NASA has planned to
launch an exciting Mars lander, Phoenix, this summer on a Delta II.
Phoenix's launch period starts August 3 and, like most planetary
missions, without ion propulsion, if it were unable to launch within a
few weeks, it would have to wait a very long time for the correct
planetary alignment to recur.

There are two pads at the complex. Phoenix has been scheduled for pad
A, and Dawn's departure will be from pad B. The pads are less than 175
meters (575 feet) apart, and prudence dictates that a rocket not launch
from one when a spacecraft - an extremely precious resource - is mounted on
a rocket at the adjacent one. In addition, there are some shared
facilities for the two pads, including the environmental control systems
for the protective enclosures for the delicate hardware. (This also is
why Dawn must be removed from 17B while Phoenix has its turn at the
starting gate.)

These considerations led to the plan to end Dawn's launch period early
enough that there would then be sufficient time and resources to devote
to preparing Phoenix for its launch.

Following a delay of 10 days in the production
of Dawn's rocket components earlier this year, the beginning of the
launch period was rescheduled for June 30. The time required to repair a
crane at 17B at the end of May and beginning
of June pushed the earliest attempt to launch Dawn to July 7. There was
much less flexibility in the closing of the launch period because of the
need to preserve the schedule for Phoenix, but creative launch teams
began looking into ways to launch Dawn a bit later than July 10.

Launching a mission into space requires much much more than the
simultaneous cooperation of a rocket, a spacecraft, and the weather.

The Delta's flight is fully controlled by its onboard computers. Even
with this launcher's extraordinarily high record of success, it is
important for engineers to receive telemetry from the rocket during the
major events of its short mission so they can verify that it performed
correctly. This allows every launch not only to benefit from the
successes of the previous ones but also, if necessary, to avoid those
rare problems that do occasionally affect rockets. Each mission, with
its unique trajectory, requires downrange tracking at certain locations.
Antennas at many ground sites are available to track the vehicles, but
often some portions of the flight are not within view of any of these
stations. In such cases, ships or aircraft are used.

For the June 20 - July 10 launch, NASA had planned to use an aircraft
(known as a P-3 Orion, a name sure to appeal to readers from Betelgeuse
to Rigel) in the southeast Atlantic Ocean to receive data from the
second and third stages. As the end of Dawn's launch period changed,
conflicts with prior commitments for that aircraft led to the decision
to use a ship instead.

Tracking ships are leased by NASA from private owners and are outfitted
with a system for acquiring the signals from the rocket. The principal
burden this system carries is its name: ocean-going test and evaluation
transportable resource (known to rocket scientists and lutrine dyslexics
as OTTR, and pronounced "otter"). Standard telecommunications systems on
the ships relay the data collected by the OTTR back to controllers via
communications satellites.

After all preparations had been made for its voyage, including
installing the OTTR hardware and vaccinating the crew members for yellow
fever, the 57-meter (186-foot) vessel left its California port on June
6, as the Dawn operations team was conducting its ORTathon.
The next day, the OTTR demonstrated that it
was operating as expected by tracking a Delta II carrying an Italian
spacecraft from Vandenberg Air Force Base in California to low Earth
orbit. The ship was projected to be in position by July 4 to track
Dawn's launch on July 7.

On June 19, the OTTR's transport reached the entrance to the Panama
Canal. While awaiting its turn to transit the canal, the ship's chief
engineer conducted an inspection of the engine and discovered a problem
in 1 of the 12 cylinders. The ship had been scheduled to stop in Puerto
Rico, so arrangements were made to repair it there. Well before it left
harbor at San Juan on June 29, it was apparent the OTTR would not reach
its destination by July 7.

As soon as the OTTR's transportation problems arose, NASA began working
on alternate plans. As part of its normal set of equipment, a U. S. Air
Force jet known as Big Crow (a modified KC-135, derived from the Boeing
707 design) has systems that could receive the Delta II telemetry. The
plane was undergoing scheduled maintenance at that time in preparation
for an appointment that would make it unavailable after July 9. Plans
were formulated to have Big Crow track the launch should it occur on
July 7, 8, or 9, with the expectation that the OTTR would be in position
by about July 10.

Besides the time required to repair the engine, there were two other
obstacles to the OTTR's providing support for Dawn's launch. Headwinds
and rough seas prevented the ship from making progress at its expected
speed. In addition, Dawn's rocket would follow a different trajectory
almost every day of the launch period, thus changing the required
location for the ship to put the OTTR within view of the rocket's
flight. When the decision was made in May to switch from the Orion to
the ship, some of the ascent trajectories were quickly replanned to
ensure that the shift from one day to the next was within the ship's
daily travel range. But now the ship, already behind schedule, was
fighting the uncooperative conditions of the Atlantic as it chased a
target that moved each day.

Meanwhile, for a time, weather seemed to be a threat to Big Crow as
well. It had to conduct a flight to verify all systems before it began
the multisegment trip to Ascension Island, its base station for the
daily flights to the coordinates for tracking Dawn's launch. Bad weather
delayed the check flight, but finally it was completed, and the bird
flew to its temporary island roost in good time.

Weather certainly proved to be a hindrance at Cape Canaveral.
Predictions of afternoon thunderstorms made Dawn's July 7 launch appear
unlikely, and prospects in subsequent days did not look much better.
Formulating an accurate forecast of the weather conditions was
essential. Two days before launch, the second stage of the Delta is
loaded with its propellants. One of the two propellants is highly
corrosive, and once the second stage has been exposed to it, the stage
remains useful for only about 37 days. After that, this part of the
Delta would have to undergo an extensive refurbishment or replacement,
either of which would consume many months and be very expensive. There
would not be enough time to have a restored or new second stage before
late October, after which the changing alignment of the solar system
would no longer allow even Dawn's powerful ion propulsion system to
accomplish the planned mission for many years.

With Dawn's launch continuing to creep up on the opening of Phoenix's
launch period, it was essential not to load second stage propellants
until favorable launch conditions were foreseen. Once the second stage
was filled, poor weather, an unauthorized incursion of a boat or
aircraft into the launch vehicle safety zone, a balky valve, a
misbehaving sensor, or any of the other myriad glitches that can lead to
a launch scrub could create a serious dilemma. If NASA made a subsequent
attempt to launch Dawn, that would deprive Phoenix of some of its
precious launch opportunities. If Phoenix were given priority so that it
would have all of the planned chances to launch during its limited
period, that would impose a very long and expensive delay on Dawn, after
which its scientific goals would be compromised. Therefore, NASA was
very diligent in waiting for all conditions to be satisfactory before
fueling the second stage.

On July 7, after several days of postponements, with forecasts still
showing a high probability of inclement weather at the time of Dawn's
daily launch windows, the projected date for the OTTR being in position
continuing to slip, and the Big Crow needing to depart soon for its
previously scheduled commitment, the decision became clear. The
exploration of the solar system (and taxpayers who fund it) would be
best served by not attempting to launch Dawn in July. Dawn has the
capability to conduct its mission with a lift off after Phoenix, whereas
the Mars lander needs to leave Earth in August.

Now Dawn is preparing to vacate Space Launch Complex 17 while Phoenix
prepares for the opening of its 3-week launch period on August 3. After
Phoenix has left Florida for the chillier north pole of Mars, Dawn will
once again take its place of honor at the top of the rocket. In the next
log, we will see how Dawn gets to spend its unplanned Florida vacation
as well as how the change in its launch date affects its mission of
exploration far from Earth.
Received on Tue 17 Jul 2007 12:14:19 PM PDT


Help support this free mailing list:



StumbleUpon
del.icio.us
reddit
Yahoo MyWeb